Simandou PROJECT
Almost 15,000 Lorbrand conveyor idlers on the world's largest high-grade iron ore deposit, exporting roughly 65% Fe ore through Africa's largest greenfield mine-rail-port project.
SimFer Simandou Iron Ore Project
Engineered for Simandou.
Simandou gives Lorbrand a reference installation on Africa's largest new mining project, with first shipments going to Chinese and global steel mills. Its ore, at roughly 65% iron content with very low impurities, suits lower-carbon steelmaking.
— Simandou · 2025From the Atacama to the Pilbara.
Cerro Verde IPCC
Freeport-McMoRan brought Lorbrand back to Cerro Verde for the 2025 IPCC expansion, thirty years after the first roller supply, with idlers and pulleys for conveyors that take over part of the pit's diesel truck haulage.
View Project →Nueva Centinela
Belt feeders for Centinela's new 95,000 t/d concentrator left South Africa fully assembled and test-run, with Lorbrand idlers and pulleys already fitted, and travelled to Chile as abnormal loads.
View Project →Western Turner Syncline 2
Rio Tinto chose a 13 km overland conveyor over truck haulage at Western Turner Syncline 2 in the Pilbara, cutting mine-gate greenhouse gas by about 3.5%, with Lorbrand carry idler frames and rollers.
View Project →