Western Turner Syncline 2 PROJECT
Lorbrand carry idler frames and rollers on the 13 km overland conveyor that moves in-pit-crushed ore to the Greater Tom Price hub.
Western Turner Syncline Phase 2 Overland Conveyor
Why Western Turner Syncline 2 took a different route.
Expanded Road Haulage
The expansion alternative was an enlarged truck fleet hauling crushed ore by road, carrying roughly 3.5% higher mine-gate greenhouse-gas emissions across a mine sustaining ~32 Mt/y for up to 15 years.
13 km Overland Conveyor
A 13 km overland conveyor carrying in-pit-crushed ore to the existing Tom Price transfer facility, chosen specifically to cut mine-gate GHG emissions by approximately 3.5% against the equivalent truck fleet, a significant lifetime CO₂ saving.
Engineered for Western Turner Syncline 2.
The overland conveyor cuts mine-gate greenhouse-gas emissions by approximately 3.5% against the equivalent truck fleet, a significant lifetime CO₂ saving on a mine sustaining ~32 Mt/y for up to 15 years. Lorbrand frames and rollers run on this flagship Rio Tinto growth project, which reached first ore in 2021.
— Western Turner Syncline 2 · 2020From the Atacama to the Pilbara.
Simandou
Almost 15,000 Lorbrand conveyor idlers carry ore at SimFer's Simandou iron ore mine in Guinea, part of Africa's largest greenfield mine-rail-port project.
View Project →Cerro Verde IPCC
Freeport-McMoRan brought Lorbrand back to Cerro Verde for the 2025 IPCC expansion, thirty years after the first roller supply, with idlers and pulleys for conveyors that take over part of the pit's diesel truck haulage.
View Project →Nueva Centinela
Belt feeders for Centinela's new 95,000 t/d concentrator left South Africa fully assembled and test-run, with Lorbrand idlers and pulleys already fitted, and travelled to Chile as abnormal loads.
View Project →