Western Turner Syncline 2 PROJECT
Lorbrand carry idler frames and rollers on the 13 km overland conveyor that moves in-pit-crushed ore to the Greater Tom Price hub.
Western Turner Syncline Phase 2 Overland Conveyor
Why Western Turner Syncline 2 took a different route.
Expanded Road Haulage
The expansion alternative was an enlarged truck fleet hauling crushed ore by road, carrying roughly 3.5% higher mine-gate greenhouse-gas emissions across a mine sustaining ~32 Mt/y for up to 15 years.
13 km Overland Conveyor
A 13 km overland conveyor carrying in-pit-crushed ore to the existing Tom Price transfer facility, chosen specifically to cut mine-gate GHG emissions by approximately 3.5% against the equivalent truck fleet, a significant lifetime CO₂ saving.
Engineered for Western Turner Syncline 2.
The overland conveyor cuts mine-gate greenhouse-gas emissions by approximately 3.5% against the equivalent truck fleet, a significant lifetime CO₂ saving on a mine sustaining ~32 Mt/y for up to 15 years. Lorbrand frames and rollers run on this flagship Rio Tinto growth project, which reached first ore in 2021.
— Western Turner Syncline 2 · 2020From the Atacama to the Pilbara.
Impumelelo
Sasol's 26.8 km Impumelelo conveyor at Secunda, the world's longest single-flight conventional belt conveyor and still the record holder, runs on Lorbrand idlers and pulleys.
View Project →Henderson
Independent testing won Lorbrand exclusive idler supply for Henderson's 24 km three-flight overland conveyor, one of the most geometrically complex ever built, running through the old rail tunnels under the Continental Divide.
View Project →Radomiro Tomic
Lorbrand's first major Chilean reference: since 1995, its idlers and overland tables have carried 17 km of overland conveyors at Codelco's Radomiro Tomic copper mine, 3,000 m up in the Atacama.
View Project →