Chuquicamata Subterránea PROJECT
Lorbrand idlers run in what is widely called the most powerful conveyor belt installation on Earth, carrying ore from the block cave beneath the world's largest open-pit copper mine.
Chuquicamata Underground Mine & Conveying System
Engineered for Chuquicamata Subterránea.
The installed drive power on the principal conveyors makes this arguably the most powerful conveyor system on Earth, and the underground transformation extends one of Chile's most strategically important mines into the 2050s. Lorbrand has supplied Codelco's Chuquicamata district since the Radomiro Tomic work in 1995.
— Chuquicamata Subterránea · 2016From the Atacama to the Pilbara.
Henderson
Independent testing won Lorbrand exclusive idler supply for Henderson's 24 km three-flight overland conveyor, one of the most geometrically complex ever built, running through the old rail tunnels under the Continental Divide.
View Project →Western Turner Syncline 2
Rio Tinto chose a 13 km overland conveyor over truck haulage at Western Turner Syncline 2 in the Pilbara, cutting mine-gate greenhouse gas by about 3.5%, with Lorbrand carry idler frames and rollers.
View Project →Impumelelo
Sasol's 26.8 km Impumelelo conveyor at Secunda, the world's longest single-flight conventional belt conveyor and still the record holder, runs on Lorbrand idlers and pulleys.
View Project →