Home
Profile
Products
Projects
Contact Us
 
 

 
Sincor  |  Henderson  |   Escondida  |   Other
 
PROJECTS: Escondida

Project: Escondida
Location: Chile

Technical Data:

Material Transported: Copper Ore
Conveyor Lengths: 580m, 3,770m, 3,716m, 1,936m
Capacity: 4,889 MTPH
Belt Speeds: 4.7 - 6.1 m/sec
Required Power: 800 kW - 4,800 kW

Typical power consumption costs per idler roll is US$20 per annum. This represents a 10% saving in annual power consumption costs over other rolls.